Do I need approval before I vacuum pack?
In most cases, yes. Under the food code adopted by the Chicago Department of Public Health (CDPH), specialized processes such as reduced-oxygen packaging require a written HACCP plan and, depending on the process, a variance approved by CDPH before you begin.
Chicago inspection reports regularly cite operations for using vacuum packaging without an approved HACCP plan. When that happens, the food and the packaging machine can be tagged and held until a plan is approved — a costly interruption for any kitchen or production room.
Which processes are covered?
- Vacuum packaging raw or cooked foods for storage
- Sous vide cooking in sealed bags
- Cook-chill packaging of soups, sauces and prepared foods
- Modified-atmosphere packaging and other methods that reduce oxygen in a sealed package
Fish, cheese and some other foods have additional limits. The exact requirements depend on the food, the method and how long you plan to hold it.
The steps, in order
- 1. List your products and methodWhich foods, which ROP method, package type and intended shelf life.
- 2. Confirm the pathwayDetermine whether your process needs a HACCP plan only, or a variance plus a HACCP plan.
- 3. Write the HACCP planProduct descriptions, flow diagrams, hazard analysis, critical control points, critical limits, monitoring, corrective actions, verification and record forms.
- 4. Train the teamStaff who package, label, monitor and record must be trained on the plan before approval and operation.
- 5. Submit to CDPHSubmit the application and plan, then answer reviewer questions and make any requested revisions.
- 6. Operate and keep recordsAfter approval, inspectors check that what you do matches what was approved — logs, labels, use-by dates and temperatures.
How long does it take?
Writing a complete plan for one process usually takes one to three weeks, depending on how many products are included and how quickly recipes and equipment details are available. Agency review time varies, so start well before the date you want to begin packaging.
What does it cost?
Safe Plate ROP HACCP support starts at $3,650 for one ROP process, delivered remotely: HACCP plan, up to 3 SOPs, logs, CDPH application and reviewer responses, a video kitchen walkthrough, virtual food safety team training (with materials for the team to train hourly employees and a review of their signed training records) and a 30-day check. An on-site visit can be added from $450. Larger product lists or multiple processes are quoted after a free initial consultation. Any agency application or review fees are paid separately to the agency.
This guide is general information, not legal advice. Requirements depend on your products and process; the regulatory agency makes the final determination.

